Pecial Act of Thailand (Ministry of Transport) Itd-vcb Joint Ventures It consisted of a Limited Italian company (Public) Construction Products are limited by the contractors who carry out the construction. Special Project Raram 3-star Ratchabur-ring Ring outside Bangkok On the West side of The Third Contract closed and temporarily diverted traffic on Bangkok Special Road To install three elevated lanes of the project, From May 1, 2067 past 31 May 2068 Every day from 9:00-05.00 am as follows:
- the upper bound star of Bangkok
- the front of the star outpost on the way to Bangkok
- happy terminus area to Bangkok entrance
Information from: Special Department of Thailand (FEB)